A Notion kanban board is a board view of a database, grouped by a Status or Select property, so each option becomes a column and each page becomes a card you drag between columns. To add one, click + next to the database's current view name and choose Board. A timeline view of the same database then plots those cards by date.
Because both are views of one database, you never keep two lists in sync: move a card to Done on the board and it's done on the timeline too. This guide builds the board step by step, covers the settings that make cards readable, shows a workaround for work-in-progress limits, and then sets up the timeline with date ranges and dependencies. Menu names follow Notion's board view and timeline view help articles as of November 2026. For the projects-and-tasks system a board usually sits in, see the Notion project management guide.
How to build a Notion kanban board
- Start from a database. For a brand-new board, create a page, click ••• under Get started with and choose Board, or type
/Board view on an existing page for an inline board. For a database you already have, click + next to the view name and choose Board.
- Check the grouping. Notion groups by a Status property if the database has one. Otherwise it picks a Select, Multi-select or Person property, and if there are none of those, it creates a Status property for you.
- Change the grouping if you need to. Open the settings menu at the top right of the database, choose Group and pick the property.
- Edit the columns. The columns are the property's options. To rename one or add a stage such as "In review", open the settings menu → Edit properties, select the grouping property and edit its options; click + beside them to add one.
- Arrange things. Drag a column heading left or right to reorder columns, and drag cards up, down and across columns.
Status or Select? Use Status for workflow. It sorts its options into three fixed groups (To-do, In progress and Complete), and Notion's task databases and sprints are built around it. Use a Select when the board isn't about progress, such as content grouped by channel or leads grouped by source.
Keep the columns to four or five. Every extra stage is another decision each time you move a card, and stages nobody can define in one sentence ("Pending", "Misc") collect cards that never leave.
Make the cards readable
Card properties
Choose what shows on the front of each card under the settings menu → Property visibility. Click the eye icon next to a property to show or hide it, and drag the ⋮⋮ handles to set the order. Two or three properties is the sweet spot: assignee, due date and maybe priority. Everything else is one click away inside the card.
Card size and card preview
Under the settings menu → Layout, Card size sets small, medium or large for every card on the board. Card preview can show the page cover, a preview of the page content (the first image on the page, if there is one) or images from a Files & media property. Fit image either shows the whole image or crops it to fill the card.
On task boards, images mostly make cards taller so fewer fit on screen. Save previews for boards where the picture is the point, such as design reviews or a content pipeline with thumbnails, and use small cards everywhere else.
Column colors and conditional color
Columns take their colors from the property's options. To turn that off, open Group from the settings menu and switch off Color columns. To color individual cards, use conditional color: settings menu → View settings → Conditional color → New color setting, then pick a property, set a rule and choose a page background. A rule on your due date that turns past-due cards red makes overdue work hard to ignore. The color fills the whole card; you can't color a single property on it.
Sub-groups and hidden columns on a Notion board view
Sub-groups add a second layer, often called swimlanes. Open the settings menu → Sub-groups and pick a property. Grouping by Status and sub-grouping by Assignee gives each person a row running across the stages, which is the quickest way to see who's overloaded.
Hiding a column keeps the board short. Click ••• next to a column heading and choose Hide group. Hidden columns are listed under Group in the settings menu, where you can bring them back. Boards don't archive cards on their own, and Notion's suggestion for a crowded Done column is exactly this: hide it, and drag finished cards into the hidden column after your weekly review.
A work-in-progress limit workaround
Kanban works best when you cap how much is in progress at once, and Notion boards have no setting that limits a column. They do show the number you need: the gray figure next to each column heading counts the cards in it by default. You can switch it to other calculations, but for a WIP limit the plain count is what you want.
Three ways to make a limit stick without a feature for it:
- Put the limit in the column name. Rename the option to "Doing (max 3)". The rule then sits right next to the count, and a count of 5 is impossible to miss.
- Give each person a filtered view. Add a board view filtered to Assignee is Me. Because "Me" means whoever is looking, the same view shows each teammate only their own cards, and their In progress count is their personal WIP.
- Agree on what happens at the limit. The rule that makes kanban work is "finish or unblock something before you start something new". Write it at the top of the board's page.
For a team of four with a limit of two cards each, that's a shared column called "In progress (max 8)" and a personal view where a third card is the cue to stop pulling work. If cards are piling up because they're waiting on someone else, add a Waiting column rather than raising the limit.
Board view or list view?
A board is best when the stage of each item is the thing you care about and the cards fit on roughly one screen. Once a column grows past that, the board turns into scrolling and stops showing you anything at a glance. A list sorted by due date is better for a long backlog or a personal to-do list where order matters more than stage, and a table is better for bulk edits.
You don't have to choose. One database can have a board for the weekly review, a list for daily work and a table for cleanup. The to-do list guide shows the list-first version of the same idea.
How to set up a Notion timeline view
The timeline is Notion's Gantt-style view: each page becomes a bar from its start date to its end date.
- Give the database a date range. A timeline needs at least one date property containing a range, so open a date and turn on End date. Without a range, nothing gets plotted.
- Add the view. Click + next to the view name and choose Timeline, or type
/Timeline view on a page for an inline one.
- Pick the dates. If you have more than one date property, the settings menu → Layout → Show timeline by chooses which one to plot. The same menu lets you use separate start and end date properties instead of a single range.
- Set the zoom. The dropdown just left of Today changes the time unit, anywhere from hours to years. Click Today to jump back to the current date.
- Show the table. Click the >> or << control on the left to show or hide a table beside the timeline. Pick its columns under Layout → Table properties, and the labels on the bars under Property visibility.
- Adjust by dragging. Drag either end of a bar to change its length, and drag items up or down to reorder them.
Small arrows at the edge of a row mean an item starts or ends outside the current window; click one to jump to it. For a database with hundreds of items, Layout → Load limit controls how many load at once. Notion's own timeline guide notes that you can also group a timeline by a property, which gives you one band per project or per person, and conditional color works here just as it does on boards. If you'd rather see the same dates next to your meetings, the timeline help article explains adding the database to Notion Calendar; the Notion Calendar guide covers that setup.
Dependencies and sub-items
Dependencies mark that one task blocks another. Turn them on from the settings menu → More settings → Dependencies, and choose how dates react when a blocking task moves:
- Shift only when dates overlap: the blocked task moves only if the two would overlap.
- Shift & maintain time between items: if task A slips a week, task B slips a week too.
- Do not automatically shift: dates never move on their own.
An Avoid weekends option stops shifted tasks from starting or ending on a Saturday or Sunday. On the timeline, dependencies show as arrows between bars, and Notion's release notes describe creating one by hovering over an item and dragging its arrow onto the item it blocks. At the time of writing, Notion's pricing page lists subtasks and dependencies on every plan, Free included, and the sub-items and dependencies article has the full settings.
Sub-items live in the same More settings menu and let a task contain smaller tasks. In a timeline they can sit nested under a toggle on the parent bar, which keeps a long plan readable.
Notion's timeline covers what most people mean by a Gantt chart: bars over time, a table alongside, dependency arrows and automatic date shifting. What Notion's help center doesn't describe for timelines is the heavier scheduling toolkit: baselines that compare the plan with what actually happened, critical-path calculation, and workload or capacity views per person.
That gap matters for a construction schedule, an event with suppliers tied to fixed dates, or any plan with long dependency chains where one slip has to ripple correctly through dozens of tasks. In those cases, keep the schedule in a dedicated scheduling tool and keep the briefs, notes and decisions in Notion. For a product launch, a content calendar or a quarter of team projects, the Notion timeline is usually enough, and having it next to the tasks is worth more than the extra features. The project management guide linked above lists other signs that a team has outgrown Notion for planning.
Two setups to copy
Personal kanban
- Properties: Name, Status, Due (date) and Area (select: Work, Home, Admin). In Status, put Not started under To-do, Doing (max 3) and Waiting under In progress, and Done under Complete.
- Board view: grouped by Status, small cards showing Due and Area, and conditional color turning overdue cards red.
- Today view: a list filtered to Status is Doing, sorted by Due, for the moments you just want to work.
- Friday routine: drag finished cards into Done, hide Done, and pick no more than three cards to start on Monday.
Waiting is the column most personal boards are missing. Anything blocked on someone else goes there, so Doing only holds work you can move forward today.
Small team sprint board
Say four people working in two-week sprints:
- Make it a task database. In the settings menu, choose More settings → Turn into Tasks and map Status, Assignee and Due. Each person's tasks then also appear in their My tasks.
- Turn on sprints. In More settings, choose Sprints → Turn on sprints. Notion creates a Sprint board with Current Sprint, Sprint planning and Backlog views, plus a Sprints database with its own timeline.
- Set up the board. Group Current Sprint by Status (To do, In progress (max 8), In review, Done) and sub-group by Assignee. Add an ID property with a prefix so people can refer to TASK-42 in chat, and show it on the cards with Due.
- Add a timeline of the projects behind the sprint work, with dependencies set to Shift only when dates overlap.
- Close each sprint with Complete sprint, and decide whether unfinished tasks move to the next sprint, go to the backlog or stay put.
The sprint planning templates and scrum board templates show finished versions of this setup.
Notion kanban templates to start from
The kanban templates collection and the broader project management templates are the quickest way to compare layouts. Free ones that match the setups above:
- Kanban board (w/ Notion AI): Notion's own board for seeing work move through stages. Check the current requirements for its AI features separately from the board itself.
- Kanban Task Board by desbyseb: a simple stage-based task board for people and small teams who don't need a full project system.
- Task Management Kanban by mrpugo: To-Do, In-Progress and Done columns with priorities, assignees, and board, list and calendar views. Add a Waiting or In review column if you need one.
- Scrum Board by The SaaSy Chick: a task board, a project and roadmap timeline, and a calendar for sprint activities.
- Agile Project Management by Notion: projects, tasks and sprints with a sprint timeline, close to the team setup above.
Or skip the template: pick a database you already use, add a board view grouped by Status, show two properties on the cards and rename your in-progress column with a limit. Run next week from it, and add the timeline once the board has earned its place.
Frequently asked questions
Can Notion make a Gantt chart?
Yes, in the form of the timeline view, which shows pages as bars across dates with an optional table beside them and arrows for dependencies. It needs a date property with a start and end date, or separate start and end date properties. Notion's help center does not describe baselines or critical-path calculation, so complex schedules may still need a dedicated tool.
Can I have a kanban board and a timeline of the same tasks in Notion?
Yes. Board, timeline, list, table and calendar are all views of one database, and you can add as many as you like with the + next to the view name. Every view shows the same pages, so changing a card's status on the board updates it on the timeline at once.
Can a Notion board group by two properties?
Yes, with sub-groups. Group the board by one property, such as Status, then choose a second property, such as Assignee or Priority, under Sub-groups in the settings menu. Each sub-group becomes a horizontal band across the columns, which works well for team boards.
How do I show subtasks on a Notion kanban board?
Turn on sub-items from the database settings under More settings, then Sub-items. On a board, sub-items can appear as a property on the parent card, or as separate cards if you choose the flattened list option. Board views only support the Parents only filter option, so filters apply to the parent tasks.
Is Notion good for kanban with a team?
For small and medium teams it works well, as long as the stages are agreed and written down. Add a Person property for assignees, sub-group the board by it, and give everyone a view filtered to their own cards. Teams that need enforced WIP limits, cycle-time reports or strict approval steps may find a dedicated kanban tool easier.